Our field experts will come to analyze your property and take photos. The data we collect here is utilized for step two.
Step 2. Planning
We put together the best plan for how to install solar panels on your roof, including whether roofing work needs to be done, electrical upgrades are needed, or if the layout needs to be adjusted for improved performance.
Step 3. Approvals
Once we have a detailed plan, we go to local authorities to get all necessary permits, (This step may vary based on your locality.) as well as your utility company to present the proposed system for their approval. In some cases, we may need to additionally coordinate with a HOA if your property is governed by one.
Before any installation can begin, we must be sure the roof is able to support solar. We will not install on any property that is not suitable for a system.
Step 2. Solar Panels
Next, we install your solar panels. This will require the racking system to be mounted on the roof and the panels will then be attached to the racks.
Step 3. Electrical Configuration
Once your panels are installed, they must be connected to your electrical panel. This will integrate your solar system to your home, providing power to all of your appliances seamlessly.
Step 1. Final Inspection
A representative from your city will examine the work we’ve done to ensure it is up to code.
Step 2. Permission To Operate
Once the city has approved the work, your utility company needs to make preparations on their end for your solar panels to join the grid. Typically this requires them coming to your property to set up your meter so it works in conjunction with your new solar system.
Step 3. Activation!
Now that everyone else has signed off, we’re ready to activate your solar panels. Flip the switch and start reaping the benefits of self sufficient energy production!
Call +1 (877) 707-7279 | Phoenix, AZ | Tucson, AZ
Transparency – Top Quality Service – Warranty